Line 12 (Beijing Subway)

Line 12
Construction site of Changchunqiao station in July 2022
Overview
Other name(s)M12 (planned name)
StatusUnder Construction
Termini
Stations20
Service
TypeRapid transit
SystemBeijing Subway
Depot(s)Tiancun, Dongba
Rolling stock8-car Type A
History
Planned openingAugust 2024 (2024-08)[1][2]
Technical
Line length29.6 km (18.4 mi)
CharacterUnderground[3]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

Tiancun yard
Yongding River diversion canal
Sijiqingqiao
Landianchang
Changchunqiao
Left arrow outer – inner Right arrow
Jingmi diversion canal
Suzhouqiao
Renmin Daxue (Renmin Univ.)
Dazhong Si
Jingzhang ICR Qinghuayuan tunnel
Xiaoyue river
Jimenqiao
Beitaipingzhuang
Madianqiao
Anhuaqiao
Anzhenqiao
Heping Xiqiao
Guangximen
Dongtucheng ditch
Ba river
Xibahe
connects line 17
Left arrow Capital Airport Express Beixinqiao
Left arrow line 10 inner
Sanyuanqiao
line 10 outer Right arrow
Capital Airport Express Terminal 3 Right arrow
Ba river
Jiangtaixi
Gaojia Yuan
Tuofangying
CR Track Test Center
(Beijing circular railway)
Dongbaxi
Dongba depot
Dongbabei
Beixiao river
Down arrow Caogezhuangbei (future extension)
Dongba Beijie (future extension)

Line 12 of the Beijing Subway (Chinese: 北京地铁12号线; pinyin: běijīng dìtiě shí'èr hàoxiàn) is rapid transit line under construction in Beijing.[4] The line is 29.6 km (18.4 mi) with 20 stations. It is fully underground.[3] The line between Sijiqingqiao and Dongbabei is planned to open at the end of August 2024, due to planning adjustments east of Dongbabei.[1][2]

  1. ^ a b "建议加快推进3,12,16,17号线进度". 2021-11-16.
  2. ^ a b "请问北京地铁12号线何时开通". 2021-06-10.
  3. ^ a b "北京地铁12号线预计2021年开通 将可换乘10余条地铁线". People's Daily. 2018-01-12. Archived from the original on 2019-02-03.
  4. ^ 北京:贯通北三环12号线开建-新华网. news.xinhuanet.com. Retrieved 2017-12-28.

From Wikipedia, the free encyclopedia · View on Wikipedia

Developed by Tubidy