M70 motorway (Hungary)

M70 motorway shield
M70 motorway
M70-es autópálya
Map key - blue in use Map key - grey other highways
Korongi.jpg
Korongi Bridge in M70
Route information
Part of E653
Length21 km (13 mi)
Major junctions
From M7 near Letenye
Toborder with Slovenia A5
Location
CountryHungary
CountiesZala
Highway system
  • Roads in Hungary

The M70 motorway (Hungarian: M70-es autópálya) is a motorway in Hungary, connecting the M7 motorway to the A5 motorway in Slovenia.[1][2] The road is 21 km long and has a speed limit of 130 km/h. The last section was completed in 2006. After the opening of the last missing sections of the M7 on August 19, 2008, there is a direct motorway link from Budapest to Slovenia. The expressway originally consisted of two lanes between Letenye and Tornyiszentmiklós interchanges. As a four-lane, full profile motorway, it opened on December 13, 2019 (see the Hungarian article for references in Hungarian). It was built by the Colas Group.[3]

  1. ^ "Orbán to Slovenian PM: 'We Are Well Aware of What Mass Illegal Migration Mean'". Hungary Today. Hungary: Hungary Today. 2019-10-28. Retrieved 2020-01-06.
  2. ^ Concrete, FIB-International Federation for Structural (2005-05-01). Proceedings fib Symposium in Budapest Hungary Vol1. Hungary: FIB - Féd. Int. du Béton, Hungarian Academy of Sciences. ISBN 9789634208389. Retrieved 2020-01-06.
  3. ^ admin (2014-11-13). "Roads". Colas. France: Colas Group. Retrieved 2020-01-06.

From Wikipedia, the free encyclopedia · View on Wikipedia

Developed by razib.in